Location:Home > News > Product Trends

Construction technology and installation method of PPR pipeline

Many owners have such distress, decoration not long, water pipe leakage, floor deformation, furniture has also been bubble In fact, all this is due to the purchase of poor quality pipes and incorrect installation methods. PPR pipeline selection method, here will not repeat. Next, learn the construction technology and installation method of PPR pipeline with Germany BQ!

1、 The following conditions shall be met before installation of PPR water pipe:

1. The construction scheme and drawn technical documents are complete, and the construction requirements and construction supply conditions of pipes, pipe fittings, special hot-melt machines and tools are available.

2. The construction personnel have received the technical training of water supply polypropylene pipe installation.

3. Temporary facilities such as construction land and material storage site, construction water and electricity can meet the construction needs

4. It is not allowed to use pipes and fittings with damage signs. If abnormal quality is found, it should be checked before and after use.

5. During the installation of pipeline system, the opening part shall be blocked in time, and the protection of products on site shall be done carefully. If there is any damage, it shall be replaced in time and shall not be hidden.

6. In winter construction, attention should be paid to the low temperature brittleness of polypropylene pipes.


WeiliTeya

MERCHANTS

Address:Daqiao Industrial Park, Ciwu Town, Zhuji City, Shaoxing City, Zhejiang Province

Tel:400-100-2886

E-mail:

WeChat Official Account

XQR code

Screen capture, wechat identification QR code

wechat number:

(Click wechat copy to add friends)

  Open wechat

Wechat has been copied. Please open wechat to add details!